Stage 6 of load shedding will continue until further notice due to a shortage of generation capacity. Stage 6 was implemented from 4pm on Saturday after unit 2 at Koeberg Power Station tripped unexpectedly.
The City of Tshwane has told residents to expect dry taps as most areas within the metro will either experience low water pressure or no water at all. kaya fm ยท Kaya 959 Website