Three tips to help optimize commercial solar installations.
Module level power electronics (MLPE) are becoming increasingly popular in commercial rooftop and ground mount solar installations due to their ability to improve return on investment (ROI) through a combination of factors: increased energy production, greater design flexibility, and lower O&M costs. The following are three common questions asked by installers when designing or installing power optimizer MLPE systems for commercial projects.
What is the best power optimizer-to-module ratio for my project?
When designing a MLPE system, it is important to determine the level of optimization required for each project. This should be based on several factors: available roof space, level of shading, and cost.
The two most popular configurations are:
Oversizing DC/AC ratio: how much is too much?
It is a fact of life that PV modules do not consistently perform at their nominal output rating. Module output power is affected by the weather, the sun’s position during the day/different seasons, local site conditions, and array orientation. In addition, module output power may decrease due to aging, soiling and shade. Using MLPE in your project maximizes power production in all scenarios, and can improve system ROI.
Oversizing the array (in comparison to the inverter’s AC power) also helps to increase energy production. This trend became popular when PV module price levels started to fall. Producing more DC power than the inverter can turn into AC energy means the system will produce peak power for longer on sunny days, and it increases the probability that it will produce maximum power in low-light conditions.
However, too much oversizing may negatively affect plant production, resulting in a longer payback period. This is because inverters are designed to generate output power up to a maximum AC power that cannot be exceeded, and they limit (clip) the power when the actual produced DC power is higher than the inverter can output. Added to this, as oversizing causes the inverter to operate at high power for longer periods, it can also reduce the inverter’s lifetime if its oversizing capacity is not sufficient.
Inverter oversizing capacity can range considerably from 135% to 200%, depending on the brand or model of the inverter. Therefore, it is essential to check the manufacturer’s information to ensure you keep oversizing within recommended limits.
How can I avoid PV connector issues?
PV connectors are a crucial component of any solar system. However, if not installed properly during installation, there may be future consequences. Below are three common connector-related errors that can occur during installation. The good news is these can be easily avoided with a little know-how.
Kleber Facchini Kleber Facchini has more than 15 years’ experience in electrical engineering, applications and product management in the renewables and utility equipment industry. As director of technical marketing, commercial & utility for SolarEdge North America, he is responsible for conceiving, defining, and launching all related products across the continent. He also oversees the applications engineering team, which works directly with SolarEdge’s installer partners.