Engineering News – Stretchable Thermometer (2:05)

This week's engineering failure is the Harbor Cay Condo Construction Collapse (6:10). Several issues (13:15) with the design and construction of the concrete slabs and columns led to the collapse of the building before it was even complete. There were consequences (29:25) for everyone involved and a lot of lessons to learn to prevent this from happening again. 

Check out our new Patreon page for Mini Failure bonus episodes - https://www.patreon.com/failurology

Photos/Sources/Summary from this episode - https://www.failurology.ca/

Ways to get in touch

Twitter - https://twitter.com/failurology

Email - thefailurologypodcast@gmail.com

Linked In - https://www.linkedin.com/company/failurology-podcast

YouTube - https://www.youtube.com/channel/UCh1Buq46PYyxKbCDGTqbsDg