Date:9/08/2008
Length: 00:16:35
Size: 7.59MB
Thought Leader: Stephen Byrn, Ph. D., Charles B. Jordan Professor of Medicinal Chemistry and Head of the Department of Industrial and Physical Pharmacy, Purdue University; and Head of the Aptuit Scientific Advisory Board
In this episode, Dr. Byrn speaks about the critical path problem in drug development and how a designed molecular delivery system can improve the drug development process.
Play Podcast
Download free related whitepaper
For more information on how you can be featured in a podcast, contact Dan Limbach at dlimbach@pharmavoice.com or call him at (847) 594-0157.