Every contractor knows the trap: you pour hours into an estimate, walk the job with your trades, do all the planning — and then lose the bid to a cheaper guy. So where's the line between free work and paid work?
In this Coaching Cuts episode, Clark tackles one of the questions he gets asked most: how much should you do for free, and when do you start charging? The answer is the pre-construction due diligence line item — and this is how you build it, price it, and sell it.
Clark breaks down:
If you're tired of giving away your best work for free and watching jobs walk, this is the episode that draws the line.
🚧 2027 Growth Conference — Austin, TX | Jan 10–12. Two days diving deep into your company — what's working, what's broken — ending with your 2027 blueprint. Day 3: hands-on electives like financial management and estimate writing to make it real. Early Bird (very limited): 30% off + 3 hotel nights covered. Sign up at contractorcuts.com
Contractor Cuts is a weekly podcast for contractors who want to build a better business — covering sales, operations, hiring, finances, and everything in between.
🔗 Book a free call: contractorcuts.com
🔗 ProStruct360 software + coaching: prostruct360.com