The news from Entergy Louisiana may have required a second reading. And a third. The utility wants to go (really) big on solar. Why now?
Entergy Louisiana asked state regulators in March to approve 3 GW of new solar resources. That's on top of its request from a few weeks earlier for 225 MW of new solar, which would have nearly doubled the state's existing capacity.
Louisiana isn't known as the friendliest to solar. What led to the sudden change of heart?
Entergy Louisiana CEO Phillip May joined Episode 44 of the Factor This! podcast to share an inside look at a Southern utility's view on the energy transition. May shared his outlook for solar, energy storage, green hydrogen, offshore wind, and more.
After a year of producing Factor This, we want to hear from you. Let us know what you've liked and how we can improve. Do you want more frequent episodes? Different topics? Click the link in the episode description to fill out our first audience survey. And help make Factor This the best it can be.
The GridTECH Connect Forum is coming to Newport, Rhode Island October 23rd through the 25th.
Click the link in the description to save the date for this unique event that's bringing together developers, utilities, and regulators to take on the critical issue of interconnection in the Northeast.
We'll be sharing more details on the agenda and speakers soon. Check out Grid TECH Connect dot com to learn more.