The university wanted a bridge for its students over a busy roadway that would appear intriguing from afar. Instead it collapsed before it was even finished. We look into how design errors, poor peer review and denial led to a collapse that claimed six peoples lives.
With John Chidgey.
This show is Podcasting 2.0 Enhanced

Report into the Incidents:

  • NTSB Final Report (PDF)

Design Criteria and Bid:

  • FIU Pedestrian Bridge Design Criteria Rev 0 (PDF)
  • FIU Pedestrian Bridge Design Criteria Rev 1 (PDF)
  • MCM / FIGG Proposal (PDF)

Civil Structural References:

  • Truss
  • Truss Bridges
  • Steel Bridge Design
  • What is Post-tensioning?
  • Prestressed, Pretensioned and Post-Tensioned Concrete
  • Engineer of Record Definition
  • Non-Destructive Concrete Evaluation & testing

Companies Involved:

  • Louis Berger is now part of WSP
  • WSP Global
  • FIGG Engineering
  • FIGG Bridge Engineers

Links of Potential Interest:

  • Florida bridge collapse has some hard lessons
  • Florida International University pedestrian bridge collapse
  • University-City Prosperity Project
  • Meet the prominent Miami firm behind the collapsed FIU bridge
  • Miami Bridge Failure Part 3: The Peer Review
  • FHWA proposes 10-year debarment for FIGG Bridge Engineers
  • Louis Berger only firm refusing to settle FIU bridge collapse
  • Bankrupt construction company that built FIU bridge reaches deal to pay victims $42M
  • Lessons learnt 3 years since Florida tragedy
  • FHWA proposes 10-year debarment for FIGG Bridge Engineers
  • Judge Rejects FIGG’s Motion to Halt 10-Year Debarment

Riverside Expressway:

  • Glimmer of hope?
  • Riverside Expressway

Support Causality on Patreon

Episode Gold Producers: 'r' and Steven Bridle.
Episode Silver Producers: Mitch Biegler, John Whitlow, Shane O'Neill, Kevin Koch, Oliver Steele, Lesley Law Chan, Hafthor and Bill.