In this podcast Ricardo Vargas talks about the main concepts involved in the earned value analysis. This podcast was recorded only in Brazilian Portuguese. The link below is for the Brazilian Portuguese version.
See All 571 Episodes of "5 Minutes Podcast with Ricardo Vargas"